Ahmad, H S, Ayoush, M D and Al-Alwan, M S (2019) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(01), 153–79.

Aibinu, A A, Carter, S, Francis, V and Vaz-Serra, P (2019) Request for information frequency and their turnaround time in construction projects. Built Environment Project and Asset Management, 10(01), 1–15.

Ershadi, M J, Edrisabadi, R and Shakouri, A (2019) Strategic alignment of project management with health, safety and environmental management. Built Environment Project and Asset Management, 10(01), 78–93.

Eyiah-Botwe, E, Aigbavboa, C O and Thwala, W D (2019) Curbing PPP construction projects’ failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(01), 50–63.

  • Type: Journal Article
  • Keywords: Factors; Public-private partnership; Stakeholder theory; Stakeholder management; Developing nations; Public sector projects;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-01-2018-0035
  • Abstract:
    Globally, inadequate resources, skills deficiency and poor infrastructure have necessitated public-private partnerships (PPPs) as investment initiative for public sector projects. The purpose of this paper is to evaluate the key constructs for improved stakeholder management (SM) success in curbing PPP projects’ failure in developing countries to fill the research gap. Pre-stakeholder identification (PSI); implementation, monitoring and feedback (IMF) factors impact on PPP projects’ success in Ghana were examined. Design/methodology/approach In total, 16 models were studied as part of literature review followed by a qualitative three-round Delphi survey for SM key factors and validated using a quantitative questionnaire survey. The findings were analysed using structural equation modelling and a model fit test. Findings PSI, IMF factors directly influence PPP SM success model hence are key constructs. Furthermore, stakeholder consideration, a clear statement of objectives, adopting design and build are variables established as influencing PPP projects failures. Stakeholder identification, engagement, communication and analysis are generic factors. Practical implications Project managers can achieve stakeholder satisfaction and improve PPP projects delivery by considering the innovative PPP SM model. Furthermore, considering the identified factors and variables in holistic models will enhance stakeholder involvement thereby curbing PPP projects failure. Social implications Reducing PPP projects’ failure will enhance socio-economic growth. Originality/value PSI; IMF factors have never been included in holistic PPP SM model. They are proposed to curb PPP projects’ failure.

Jalali, A, Hidzir, N I, Jaafar, M and Dahalan, N (2019) Factors that trigger bullying amongst subcontractors toward intention to quit in the construction projects. Built Environment Project and Asset Management, 10(01), 140–52.

Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2019) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(01), 64–77.

Owolabi, H, Oyedele, L, Alaka, H, Ajayi, S, Bilal, M and Akinade, O (2019) Risk mitigation in PFI/PPP project finance. Built Environment Project and Asset Management, 10(01), 28–49.

Rethnam, O R, Palaniappan, S and Ashokkumar, V (2019) Life cycle cost analysis of 1MW power generation using roof-top solar PV panels. Built Environment Project and Asset Management, 10(01), 124–39.

Sayed, A M, Assaf, S, Aldosary, A S, Hassanain, M A and Abdallah, A (2019) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(01), 16–27.

Tennakoon, G, Waidyasekara, A and Ekanayake, B (2019) Revisiting the role of professionals in designing buildings with low embodied and operational energy. Built Environment Project and Asset Management, 10(01), 110–23.

Ugulu, R A, Arewa, A and Allen, S (2019) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management, 10(01), 94–109.